Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Been using Pentagon X2 Holeformance for 3 weeks in Champion Mill. 60 AMPS savings so increased Feed Rate which increased throughput 8%. The Champion capacity is 65 Million and Currently Running at 70-71 Million. Easy to install and fewer spacers! We removed [Brand X] Hammers from a 2nd Mill and replaced with Pentagon X2 Holeformance to get the same savings and increased throughput.”
“The Pentagon Hammer Set we have in our Roskamp meal grinder is working very well. I’ll be buying at least two more Sets of these hammers for our other machines.”
“After the Jacobs guys came out and helped our operators they are now more confident in their ability to raise the temperature and push the pellet mill to its limits. With the lightning dies installed we are seeing the amperage drop and our cooler is being overrun. What a great company to work with!”
“We have one more set of [Competitor] hammers to go through and then going exclusive with Pentagons. For ease of installation and performance, the Pentagons can’t be beat!”
“Feed flow did increase, we were able to turn them up and get more AMPS on our ground grain elevator. Very satisfied with the Pentagon Hammers. Showed them to sister plant and he is interested in getting a set. I told him I was sold on them.”
“Lightning Die has better PDI by 15%, designed right for the DDG Formulation. Very impressed with quality up and AMP draw 15% less.”
“Both mills running Pentagons. Last sets ran for about 11 months, pushing 13,000 to 14,000 ton per week. 572,000 tons of life on hammers!”
“Very happy with Jacobs Dies! Performing better than [Competitor]. Want another die like the last one.”
“Maintenance Manager said he is now a Jacobs guy as the performance of the die he has been using is getting 30% to 35% more tonnage compared to [Competitor].”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”