Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“My operators love the Lightning Die and would kill me if I switched back. The Lightning Die solved many of our pelleting problems!”
“The Jacobs Hammers are in the mill and outlasting the hammers we ran before!”
“Jacobs does a great job of keeping up on our screen needs – price/lead time are always better than other manufacturers.”
After running the Dupps Grindor’s for several months changing the Dupps hammers every 2 days, we ran a trial on the Jacob’s Hammers for the Dupps Grinder and found that we were able to get 5 days of life. We run strictly all beef and bones straight from slaughterhouses.
“Maintenance Manager said he is now a Jacobs guy as the performance of the die he has been using is getting 30% to 35% more tonnage compared to [Competitor].”
“Jacobs rods resist grooving much better than the other brands I have used in the past.”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“I am impressed with Jacobs Hammers, they last a long time!”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”