Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Been using Pentagon X2 Holeformance for 3 weeks in Champion Mill. 60 AMPS savings so increased Feed Rate which increased throughput 8%. The Champion capacity is 65 Million and Currently Running at 70-71 Million. Easy to install and fewer spacers! We removed [Brand X] Hammers from a 2nd Mill and replaced with Pentagon X2 Holeformance to get the same savings and increased throughput.”
“Jacobs does a great job of keeping up on our screen needs – price/lead time are always better than other manufacturers.”
“Maintenance Manager said he is now a Jacobs guy as the performance of the die he has been using is getting 30% to 35% more tonnage compared to [Competitor].”
“There is no comparison out there to the durability of Jacobs Hammers, they’re amazing. Hardfacing is so good, the hammers are not wearing out. Only buying Jacobs Hammers!”
“After the Jacobs guys came out and helped our operators they are now more confident in their ability to raise the temperature and push the pellet mill to its limits. With the lightning dies installed we are seeing the amperage drop and our cooler is being overrun. What a great company to work with!”
“Both mills running Pentagons. Last sets ran for about 11 months, pushing 13,000 to 14,000 ton per week. 572,000 tons of life on hammers!”
“What Chad has told me has come true, the Lightning out performed [Competitor] and the other new dies out there hands down!”
“Feed flow did increase, we were able to turn them up and get more AMPS on our ground grain elevator. Very satisfied with the Pentagon Hammers. Showed them to sister plant and he is interested in getting a set. I told him I was sold on them.”
“My operators love the Lightning Die and would kill me if I switched back. The Lightning Die solved many of our pelleting problems!”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”